-
Who This Checklist Is For
-
The 7-Step Checklist
-
Step 1: Read the FLA off the nameplate—not the horsepower
-
Step 2: Confirm phase and voltage before you search
-
Step 3: Classify the load—this is the step almost everyone skips
-
Step 4: Match the duty rating and overload spec
-
Step 5: Check enclosure and environment
-
Step 6: Lock down the control interface
-
Step 7: Verify the vendor's paperwork before you release the PO
-
Step 1: Read the FLA off the nameplate—not the horsepower
-
Common Mistakes to Avoid
Who This Checklist Is For
If you're the person who places the order—not the one who sizes the drive—this is for you. I handle purchasing for a 140-person manufacturer: roughly $680K a year across 11 vendors, and I report to both operations and finance. When our maintenance lead says "get a VFD for the 5HP motor," I'm the one who has to turn that into a purchase order that doesn't come back.
Here's the checklist I use now. Seven steps. The first one takes about 20 minutes if you've never done it; after that, 10. Same process applies whether you're ordering a drive, a motor controller, or a batch of micro linear actuators—the details change, the logic doesn't.
Full disclosure: I'm not an electrical engineer. My job is to make sure engineering gets what they asked for, finance doesn't reject the invoice, and nothing shows up that has to be shipped back. That's the lens here.
The 7-Step Checklist
Step 1: Read the FLA off the nameplate—not the horsepower
This is the step that would have saved me a lot of grief two years ago. "5HP" is a nominal rating. What actually sizes the drive is the full load amps (FLA) stamped on the motor's nameplate, and that number moves with voltage, phase, and the motor's design.
If the nameplate is missing or unreadable—which happens more than you'd think on older equipment—pull the FLA from the tables in NEC Article 430 (Article 430.250 for three-phase motors). Depending on voltage and phase, a 5HP AC induction motor typically lands somewhere between roughly 8 and 28 amps, so don't guess. Verify against the current edition of the Code or have your maintenance lead confirm it in writing.
If you're ordering a Johnson Electric motor alongside the drive, their spec sheet usually lists FLA directly. Use it. Better to over-communicate than to eat a restocking fee.
Step 2: Confirm phase and voltage before you search
Single-phase 230V and three-phase 230V are not the same purchase. Neither is 460V. I once pulled a quote for a three-phase drive on a job where the motor was single-phase—caught it at the last second, but only because the vendor asked.
Ask the maintenance lead for: incoming supply voltage, phase, and whether the motor is wired for high or low voltage. Put all three in the PO notes. This takes 30 seconds and prevents the single most expensive category of return.
Step 3: Classify the load—this is the step almost everyone skips
This is the one I'd flag if you only remember one thing. A VFD sized for a pump is not necessarily the right VFD for a conveyor, even if both are driving 5HP motors.
- Variable torque loads (centrifugal pumps, fans): torque rises with the square of speed. These can often use a drive rated for "light duty" or "normal duty."
- Constant torque loads (conveyors, mixers, positive-displacement pumps, compressors): torque stays roughly flat across the speed range. These need a "heavy duty" rating with higher overload capability.
Ask which one applies. If the lead shrugs, ask what the motor is actually driving. That question usually gets you the answer.
What most people don't realize is that a drive labeled "5HP" might be listed as 5HP heavy duty or 7.5HP light duty depending on how the manufacturer rates it. Same box, different numbers. This is where the price gap between two "5HP VFDs" comes from.
Step 4: Match the duty rating and overload spec
Once you know the load type, check the drive's overload rating: typically 150% for 60 seconds on heavy duty, or 120% for 60 seconds on light duty. A constant-torque load on a light-duty-rated drive is how you end up with a warranty claim in month four.
Practical check: pull the datasheet, find the "heavy duty" and "light duty" amp columns, and confirm the motor's FLA fits the column that matches the load type from Step 3.
Step 5: Check enclosure and environment
NEMA 1 (open), NEMA 12 (dust-tight), NEMA 4X (washdown)—the wrong enclosure is an install-day problem, not a purchasing-day problem, and it's always the purchasing department that gets the call.
Ask: where is it going? Washdown area, dusty floor, or a clean panel? Ambient temperature matters too—most drives are rated for 40°C ambient, and derating kicks in above that. If the panel is in a hot mechanical room, flag it now.
Step 6: Lock down the control interface
How will maintenance actually run this thing? Keypad, remote potentiometer, 4–20mA signal from a PLC, Modbus, Ethernet? Get the answer in writing before the PO goes out. A drive with the wrong communication card is functionally a brick until someone buys the add-on module—and that module usually ships separately, on its own lead time.
Also confirm whether the drive needs a built-in disconnect, line reactor, or EMC filter for the installation. These are the line items that turn a $700 quote into a $1,100 invoice.
Step 7: Verify the vendor's paperwork before you release the PO
This is the administrative step, and it's where I add the most value. Before the PO goes out:
- Confirm the vendor can issue a proper invoice with PO reference, unit price, and tax breakdown. I learned this the hard way in 2022—found a great price on a replacement actuator, ordered it, and got a handwritten receipt. Finance rejected the expense. I ate the cost out of my budget.
- Ask for the drive's UL listing (UL 61800-5-1 or 508C, depending on the unit) and confirm it matches what's on the datasheet.
- Get the lead time in writing. If your motor came from Johnson Electric Industrial Manufactory Ltd or another tier-one supplier, their documentation is usually clean—but confirm the drive vendor's isn't a reseller with a 6-week backorder behind a 2-week promise.
- Request the warranty terms in writing. 12 months is standard; 18 or 24 months is a negotiating point.
Common Mistakes to Avoid
Sizing by horsepower instead of FLA. This is the number-one cause of returns. Horsepower is a marketing number; FLA is the engineering number.
Assuming "5HP VFD" is a universal spec. It isn't. Light duty vs heavy duty, single-phase vs three-phase input, and enclosure type all change the part number.
Skipping the load classification. It's one question, and it determines whether the drive you order costs $600 or $900—and whether it survives the first year.
Forgetting the accessories. Line reactors, braking resistors, and communication modules rarely show up on the first quote. Budget for them or your "under budget" VFD project will come in over.
Not verifying invoicing capability up front. A cheap vendor who can't produce a compliant invoice is more expensive than a slightly pricier one who can.
What was best practice in 2020 may not apply in 2025, and VFD sizing is a good example. Older rules of thumb—"match the drive HP to the motor HP"—came from a time when light-duty and heavy-duty ratings were more standardized across brands. They aren't anymore. The fundamentals haven't changed, but the execution has. Read the datasheet, confirm the load, and don't assume the label tells the whole story.
Pricing and spec references in this article are for general guidance only and reflect information available at the time of writing. Verify current NEC tables, UL listings, and vendor pricing before placing an order.